Installation in Cantabria (pretty far away from grid connections) with an Voltronic inverter, Pylontech batteries and JA Solar modules. The single phase inverter has an additional entry for a diesel generator. Lots of layouts, system design, consulting and parts of the construction. The total installation might take until 2023 to be finished.